Mold jacking method - メーカー・企業と製品の一覧 | イプロス

Mold jacking methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Dual Shield Method

Easily construct pipelines in densely populated urban areas! A construction method that shortens the construction period.

The "Dual Shield Method" is a shield switching type of thrust construction method that incorporates the advantages of both thrust and shield methods. It employs a cost-effective thrust method for gentle curves and straight sections, while using the shield method for sharp curves and continuous curve sections. This makes it easier to construct pipelines in densely populated urban areas, significantly reducing costs. 【Features】 ■ Capable of sharp curves (R10m) without the need for rotating shafts at intersections ■ Can be constructed with shafts sized for thrust methods ■ Equipment from thrust methods can be used ■ Average daily progress increases by combining thrust methods ■ Using a mud slurry method increases thrust extension *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Mold jacking method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録